Wednesday, 26 March 2014

Prusa i3 Y axis length for box version

The issue

I got to the point in my build when its time to attach the Y axis to the frame and noticed something very off between the guide and my build.

My Y axis was a fair bit shorter then the one shown in the guide, which meant if I had the motor at the back, as per the guide, I would lose a fair amount of print area.

Why

Looking around the forums I noticed I wasn't the only one with the issue and it was caused by a difference between the official github and the wiki.
The wiki stating 370mm smooth rods with threaded rod to match and the github stating 405mm smooth rods and threaded rod to match.

The difference (35mm) is roughly the size of the mounted Y axis motor and the print area lost if mounted at the back.

Semi-fix

Move the motor to the front, remove the washer and nut from the idler side and move the belt tensioner on the bed plate.
Moving the motor to the front gains a few cm's, removing the extra bolt and washer gains roughly 1 cm and moving the belt tensioner should regain the last few cm/mm.

Dragonfly DIY's blog outlines the changes.

Its still not ideal however as its its re-drilling the print bed wood, removes the supporting washer holding the Y axis to the frame, doesn't look as clean (you have wires going from the very front to the back along the Y axis) and leaves little room for error/tweaking.

As I've already got the correct length threaded and smooth rod on hand from my original Prusa I will order some more GT2 belt (2m so I have some spare) and will re-build the Y axis later.
For the time being however 150x200x200 (mm of course) should be enough to allow me print some basic things to improve my setup (RAMPS mount, RasPi mount, auto bed levelling parts and spool holder)

Wednesday, 19 March 2014

Prusa i1 to i3 upgrade - Build day 3

I'm a bit backlogged on my posts as I got a horrible cold the day after build day 2 (Friday) which has only just started to fade. I did bits and pieces but never spent any real time.

As previously mentioned I'm following this guide and will only be documenting things I have trouble with or do which the guide doesn't state.

Print bed - Smooth rod distance

It all looked very straight forward until it came to check it moved smoothly, as attaching the bed involves drilling and screws it moved slightly.
After a few attempts at tweaking the width to get it moving smoothly I decided to put down the spanners and work out the optimal distance myself.
Some amazing photoshop skill

Add the blue lengths
Add the green lengths then half them (this gives you the center of the plastic part which should be the center of the bearing).
Add the result of the above values then take this away from the yellow/orange value.
yellow - ((blue + blue) + ((green + green)/2))
This gives you the distance between the center of the top and bottom bearings. To get the gap between the smooth rods just minus the width of a smooth rod.


Measure the width of a Y corner piece. From this value minus the width of the smooth rod.

Take this value from the distance calculated from the printbed.
This is the width between each corner piece.

 

Belt holder

Following the guide its pretty straight forward however if your belt holder is loose and doesn't hold the belt when its tight the guide recommends "shim it with an M3 washer or a piece of card".
Which in simple turns means jam small washer(s) or hard peice(s) of card under the belt until it doesn't slip.
Like so

End of Day 3

The rugby six nations grand final (unlucky England, well played Ireland) was on and I felt very rough so this is all as I did on day three.

Days build time: ~1 hour*
Total build time: ~4 hours

I did the work between matches and during half time so could have been 1h30m or 45m as I wasn't paying much attention.

Thursday, 13 March 2014

Prusa i1 to i3 upgrade - Build day 2

Due to the issue with missing plastic parts I had a day break between build days.

True to my jump to section I like the look of style instead of attaching the last piece of wood to the frame I jumped to the Y axis.

As previously mentioned I'm following this guide and will only be documenting things I have trouble with or do which the guide doesn't state.

Y Axis corner blocks - aka the missing Arduino box

The assembly is pretty straight forward, however the guide states to use the Arduino box and gives no dimensions of it.
As my Arduino's are clones (much cheaper and the same functionality) they didn't come in the official box and the box they did come in has long been binned.

I checked around and according to the official RepRap forums its purely used as a spacer to ensure the smooth rods are level. So referrencing the image I looked around for something similar size and found a Raspberry Pi box and used it.
I measured the box and it was slightly (~0.1m) over 12cm in width.

I found a quick way to ensure booth sides are the same width is to attach a M8 bolt (or piece of M8 threaded rod) through one side and attach a nut.
The alignment both using the same box (or callipers).
The picture is poor quality, but you can see the bolt on the left corner piece.
As well the the Raspberry Pi box.

This shows the bolt a little better.

Smooth rods

The smooth rods referenced in the guide for the Y axis are actually the shortest of the smooth rods.
The guide is a little confusing as it references them as the long smooth rods.

If you threaded rods are line mine, only slightly (5cm to 10cm) longer then the shortest smooth rods its best to have the corner pieces at the very ends of the threaded rod, otherwise you'll be adjusting there location until they are.
Contracory to the guide I its easier to put the bearings on the smooth rods when you first insert them as they are clip fit pieces and are a pain to get out without messing up the alignment.

Y axis idler

The guide is using 624zz bearings while I had planed to reuse my 608zz bearings so I had to make slight adjustment.
Below is the setup I'll be trying first.
Flash seemed to make the image clearer, but darker at the same time

Its M8 bolt, washer, plastic, mudguard washer, 608zz bearing, mudguard washer, plastic, washer, two M8 bolts.
As there isn't room for standard washers I used the two nuts to keep it in place while allowing the bearing to turn.

End of Day 2


At this point my niece had gone to bed and I didn't want to run the risk of waking her up by drilling so I called it a day.

My desk/workbench is filling up, but the build is coming along nicely.

If everything goes well and I don't get any hickups I should be ready to start printing this weekend.

Days build time: ~1 hour
Total build time: ~3 hours